欧美爱爱免费视频_亚洲AV永久无码精品一区二区国产_久久艹在线观看_成人精品一区日本无码网_日韩午夜精品_av免费在线视

Dongguan MLF Tech Co.,Ltd

Set production, development, sales, one-stop service

Sales service phone

+86 0769 87989659

PRODUCTION OF ELECTRIC CHARGERS: how to produce electric car chargers

2022-05-24 17:04:26
0

PRODUCTION OF ELECTRIC CHARGERS: how to produce electric car chargers, to ensure that it is beneficial to the battery life, to ensure transmission safety, to use ultra-low voltage drop chargers, I use both fully separated components of the ultra-low voltage drop linear stability protection line assembly, also use imported ultra-low voltage drop linear integrated circuit, also use switch modulation integrated circuit. The problem you are describing is caused by the low level of design and the high pressure of cost limitation of the electric bicycle charger. For high-energy batteries, it is important to continuously monitor the temperature rise of the battery. For lead-acid batteries, it is much more tolerant. If the temperature rise of the lead-acid battery is too high, the battery has already been overcharged. The reflection that the charger can not jump automatically is very common, the simplest way is the series ammeter, manual monitoring, according to the actual situation, timely manual forced conversion to low floating charging voltage; The obstacle is that now the charger manufacturers are keeping the circuit secret. It takes several days to read the assembly distribution of the circuit in detail and redraw the circuit diagram by reverse engineering before the modification measures can be made.Even more difficult is the fact that the current method of charging several batteries with a rated voltage of 12 volts in series is seriously flawed. After dozens of charging and discharging cycles, the capacity of each battery and the voltage difference between each battery are increasing, even if the manual intervention charging, but also a drop in the bucket, unhelpful, anxious, unable to help. The complete solution is to each battery a charger, each battery has an independent voltmeter, ammeter continuous monitoring, this charger is not the current three-stage charger or the enterprise promotion of “Computer Intelligence”charger.

Production of electric chargers

 


Current URL: http://m.ferw.com.cn/en/news/136.html

相關(guān)產(chǎn)品

Relevant News

主站蜘蛛池模板: 丰满人妻一区二区三区无码av | 亚洲a区在线视频 | 国产精品国产三级国产普通话一 | 噜噜噜视频在线观看 | av污在线观看 | 美女不带套日出白浆免费视频 | 日本爆乳无码一区二区 | 少妇富婆一区二区三区夜夜 | 日韩国产精品无码一区二区三区 | 欧美一级淫片a | 好骚综合av | 久久久首页 | 噜噜色噜噜 | 久久精品免费看国产免费软件 | 成年人在线免费看 | 国产一区二区三区精品在线观看 | 美女不带套日出白浆免费视频 | 免费1级a做爰片在线观看 | 免费网站毛片 | 国产00粉嫩馒头一线天萌白酱 | 亚洲AV无码国产精品麻豆天美 | 亚洲精品一区二区 | 成人免费a级片 | 欧美日韩小视频 | 日本熟妇HDSEX视频 | 欧美极品日韩极品1 | 最新黄色在线 | 成人18毛片| 国产精品JK白丝AV网站 | 99美剧| 在教室伦流澡到高潮hgl视频 | 日本免费一二三区中文 | 啊v在线看 | 2021国产精品一卡2卡三卡4卡 | caoporn免费在线 | 邻居少妇张开腿让我爽了一夜 | 成人精品在线观看视频 | 伊人.com | 国产欧美日韩在线在线播放 | 免费观看做爰视频ⅹxx午夜 | 久久久精品99久久精品36亚 |